Swadarma PHB Retaining Wall Repair Completed

Pesanggrahan Water Resources (SDA) Unit has repaired Jalan Swadarma Raya’s connecting (PHB) channel retaining wall, South Jakarta.

Pesanggrahan SDA Unit Head, Eli Menawan Sari stated this retaining wall has two meters long and three meters high. “Repairing is done since Monday (1/14) and now it is completed,” she conveyed, Wednesday (1/16).

She deployed 10 SDA Unit personnel to repair the old retaining wall. It uses river stones, cement, and sand to repair it. Personnel also make the new foundation using 30×30 square centimeters iron with two meters long. While its vertical frame size is 30×30 centimeters with three meters long.

“We hope it can make it stronger and last longer after being repaired,” she expressed.

Source: Berita Jakarta